Featured

zipBoard feature update
Feature Update: Kanban UI & a New Content Manager

Our new update brings the Kanban view and a content manager, along with some UI changes. All of this makes managing content on zipBoard a lot more streamlined!

For documentation teams shipping regulated, complex, or cross-functional content, approval is the stage where traceability either exists or it doesn't.
Document Approval Workflow: A Complete Guide

A document approval workflow is the governed stage at the end of a review cycle where named approvers confirm a specific document version is ready for release. Most teams run this through email or comments, producing no audit trail. This guide covers the stages, roles, failure modes, and what separates checkbox approval from governed approval.

Technical Document Review Workflow: Stages, Stakeholders & Approvals
Technical Document Review Workflow: Stages, Stakeholders & Approvals

A technical document review workflow is the governed sequence of stages a technical document moves through before publication: peer review, SME review, editorial review, compliance review, and final approval, with defined reviewers, deliverables, and sign-off criteria at every stage. A well-designed workflow gives documentation leads three things: complete review coverage (no SME feedback missed), full

The Project Manager’s Guide to Drawing Approvals and Submittal Tracking

Direct Answer:  Project managers track drawing approvals by: Recording the reviewer name and decision (Approve / Revise / Reject). Linking every approval to a specific drawing version (never to a generic filename). Maintaining a centralized log or platform (single source of truth). Capturing automatic timestamps for audit, dispute, and compliance purposes. According to a landmark

How Construction Teams Manage Drawing Reviews (Without the Chaos)
How Construction Teams Manage Drawing Reviews (Without the Chaos)

Direct Answer: The best way to manage drawing revisions is to use a centralized drawing review platform that provides version control, comment tracking, structured workflows, and a complete revision history. This ensures all stakeholders work on the latest drawings, reduces errors, and prevents costly rework. In the architecture, engineering, and construction (AEC) world, construction drawing review

Best Practices for Efficient Document Reviews and Collaboration

Construction Administration (CA) consistently presents significant challenges for project stakeholders, such as operational inefficiencies, scheduling delays, and escalating costs. These challenges aren’t isolated incidents, as they stem from inherently complex project dynamics. The core issue resides in the fragmentation of responsibilities across numerous participants; owners, architects, general contractors, and various subcontractors. As noted by Ofori

©️ Copyright 2025 zipBoard Tech. All rights reserved.